Iraq’s Ministry of Industry and Minerals is considering implementing a project to process and recycle damaged and used oils, with the aim of reusing them to produce oils suitable for use, as part of efforts to support domestic production and reduce the need for imports.
Ahmed Jamil, Director of the State Company for Hydraulic Industries affiliated with the ministry, said in a statement to the official newspaper, monitored by Alsumaria News, that “the company is studying a specialized project to process and recycle damaged and used oils, with the aim of rehabilitating them and converting them into reusable oils by utilizing available capabilities and resources and developing the company’s production capacity.”
He noted that “a meeting was held with the participation of several specialists and relevant officials at the company to discuss the technical and scientific aspects of the project, as well as establish appropriate mechanisms for its development and prepare the necessary technical study, while providing the required support to complete the requirements for its implementation.”
Jamil added that “the study focuses not only on processing used oils but also on developing and improving the base oils used in the oil production project. It also examines the possibility of manufacturing the equipment and production lines required for processing and recycling locally, thereby strengthening national manufacturing capabilities and supporting the ministry’s efforts to localize technology and reduce dependence on imported equipment.”
He pointed out that “the project aims to make optimal use of used oils and reuse them instead of disposing of them as waste that could cause environmental damage. It also offers the possibility of reducing production costs, limiting reliance on imports, and utilizing available resources to improve production efficiency and enhance the quality of locally produced oils.”
In the same context, the Director of the State Company for Hydraulic Industries explained that “moving forward with the project toward the implementation stage depends on completing the technical study and evaluating the requirements for processing and recycling operations, ultimately determining the project’s production capacity and its overall technical and economic feasibility.”


